Pro Tips
How to Make Daily Site Reports Faster
Joseph, Co-founder
Image Credit:
Pexels
The fastest way to make site reports is to stop building them at the end of the day. If every photo is tagged and pinned to the plan when it is taken, a daily or weekly report becomes a filter and an export from your phone. The slow part, copying photos into a template and typing where each one was taken, disappears.
Why reports take so long now
On most sites the report is assembled after the walk: photos pulled from a chat group, matched to notes, renamed, dropped into Word or PowerPoint and captioned. FMI and PlanGrid found construction staff spend 14.1 hours a week on non-optimal activities, including 5.5 hours looking for project data. Reporting from scattered photos is a large share of that.
Two changes that remove most of the work
1. Tag at capture
Tag photos as you take them (#L03, #defect, #M&E). The report can then be filtered by level, trade or status instead of sorted by hand. See how to set up a tag library.
2. Pin to the plan
Each photo is anchored to its spot on the drawing. The report shows the location automatically, so nobody types "near grid C4, Level 3" again.
From site walk to report
Old workflow | With Otus |
|---|---|
Photos spread across personal chats | Shared album: every site photo in one place |
Hunting for past records | Filter: by tag, author, location or date |
Report compiled at the desk | Export: PDF or PowerPoint generated from selected photos |
Defect list kept in a spreadsheet | Issues: assigned, tracked and closed with photo proof |
Notes typed after the walk | Voice notes: transcribed in multiple languages and filled into the record |
A daily report routine that works
Walk the site with the plan open on your phone.
Tap the plan, take the photo, apply 2 or 3 tags, speak a short note.
Raise anything needing action as an issue and assign it on the spot.
At the end of the walk, filter today's photos and export the report.
Share the PDF or slides with the team, or present it at the site meeting.
FAQ
What should a daily site report include?
Work done by area, manpower and weather if required by your contract, issues raised and closed, and photos with their locations.
PDF or PowerPoint?
PDF for the record and for formal submissions; PowerPoint for site and client meetings. Otus exports both from the same photos.
Can reports be done without a laptop?
Yes. Otus generates reports from your phone.